In November 2020 the Werribee line was shut down for one week to enable the Level Crossing Removal Authority to work on the removal of the Cherry Street and Werribee Street level crossings in Werribee. However just before the planned reopening date, a “signalling fault” saw the closure extended by one week, and then by […]
